Aerospace
Briarfields
Cedar Run
Firestation 40
Fort Belvoir
I-95 & I-395
I-495
I-895
James Bland
Julie Metz
Lake Audobon
North Fork
Residential Rain Gardens
Sequoia Farms
Sunrise Valley
Thomas Brawner Gaines
north fork wetlands bank

 

Prince William County, Virginia
Owner: Boy Scouts of America

This 125-acre project, conceived and developed by WSSI, is the second private wetlands bank approved in northern Virginia.  (Julie J. Metz Wetlands Bank [LINK], also conceived and designed by WSSI, was the first.)  Construction of the project began in June, 1998, and was completed in July, 2000. The project’s innovative design elements provide wetlands with high functions and values that can be used by developers and governmental agencies to offset unavoidable wetland impacts from other, smaller projects.  The 125 acres consist of approximately 80 acres of constructed wetlands and waters with the remainder of the site being reforested upland buffers.  The site was donated to the Boy Scouts of America upon its completion and has been incorporated into the Boy Scout’s Camp Snyder, offering nature trails, board walks, and interpretative facilities for environmental education programs. 

North Fork’s unique design features include:

  • This was the first mitigation bank approved to sell stream credits in Virginia;
  • An impounded area consisting of 45 acres of wetlands (formed by a 1,600 linear feet long, 25 feet tall dam designed for the Probable Maximum Flood (P.M.F.) event with 2 feet of free board in an +800 acre watershed);
  • Numerous vernal pools (made by creating low areas and lining them with clay) to serve as resting spots for migrating birds and refuges and reproducing areas for amphibians;
  • A 7-acre open water area providing canoeing opportunities for the Boy Scouts; and
  • Extensive areas that provide a progression of high quality habitat for submerged aquatic vegetation, floating aquatics, emergent, scrub shrub, and forested wetlands, and buffered reforestation areas.

Also see our .pdf presentation on this project.

WSSI Provided the following services for the North Fork Wetlands Bank:

  • WOUS Delineation Report
  • Jurisdictional Determination
  • Archeology Phase I report
  • ETS Research
  • Wetland Mitigation Concept Plan
  • Wetland Design/Construction Plan Set
  • As-built Survey
  • Mitigation Banking Instrument
  • Mitigation Credit Accounting Ledger
  • COE Nationwide Permit
  • Vegetation and Hydrology Monitoring Reports
  • Soil Permeability/Fertility Testing
  • Photo Documentation
  • Dam Inspections


 

 

Home About WSSI Services Resources & Regulations Projects Careers Contact Us Privacy Policy Terms & Conditions

Copyright 2011 Wetland Studies and Solutions, Inc. The Wetland Studies and Solutions logo is a registered trademark of Wetland Studies and Solutions, Inc. All rights reserved